• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Glass Fiber Reinforced Polymer (GFRP) Rebar Manufacturing Business
Glass Fiber Reinforced Polymer (GFRP) Rebar Manufacturing Business

Rebar made of glass fibre reinforced polymer is a highly valuable building material. Governments and other large-scale... Read More

Capacity :
1200 MT per Day
Plant and Machinery cost:
58800000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
609700000.00Lakhs
Add To Inquiry Basket
Business Plan Production of Sodium Hypochlorite Start your Business in Chemical Industry
Business Plan Production of Sodium Hypochlorite Start your Business in Chemical Industry

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
India Hydrofluorocarbons Market
India Hydrofluorocarbons Market

 

Hydrofluorocarbons, or HFCs, are man-made Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Chilli Oleoresin Manufacturing Business
Chilli Oleoresin Manufacturing Business

Paprika oleoresin is a natural food colorant used to obtain ... Read More

Capacity :
Chilli Oleoresin 7,500 Kg Per Day
Plant and Machinery cost:
2192.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
3533.00Lakhs
Add To Inquiry Basket
Setting Up Banana Ripening Chamber
Setting Up Banana Ripening Chamber

A banana ripening chamber is a controlled environment where ... Read More

Capacity :
Ripe Banana 8 MT per day
Plant and Machinery cost:
32.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
193.00Lakhs
Add To Inquiry Basket
Set up Mini Steel Plant (Billets and TMT Bar)
Set up Mini Steel Plant (Billets and TMT Bar)

 

A mini steel plant is a smaller version of an inte... Read More

Capacity :
Steel Billets 150 MT Per Day TMT Steel Bars (Rebar) 150 MT Per Day
Plant and Machinery cost:
5445.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
10417.00Lakhs
Add To Inquiry Basket
Start Creamy Peanut Butter Production Business
Start Creamy Peanut Butter Production Business

Creamy peanut butter is a type of peanut butter that has bee... Read More

Capacity :
Creamy Peanut Butter 10,000 Kgs per day
Plant and Machinery cost:
128.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
1038.00Lakhs
Add To Inquiry Basket
Start Production Business Of Electric Vehicles (Electric Motorbikes and Electric Scooters)
Start Production Business Of Electric Vehicles (Electric Motorbikes and Electric Scooters)

 

An electric vehicle is a vehicle that uses electricity to power its motors. Ele... Read More

Capacity :
Electric Motorbikes 10.0 Nos. Per Day Electric Scooters 10.0 Nos. Per Day
Plant and Machinery cost:
251.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
1724.00Lakhs
Add To Inquiry Basket
Setting up uPVC and CPVC Pipes Business
Setting up uPVC and CPVC Pipes Business

 

uPVC is an acronym for un-plasticized polyvinyl chloride. It is also known as r... Read More

Capacity :
CPVC Pipes 50 mm 4 MT Per Day uPVC Pipes 150 mm 8 MT Per Day
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
414.00Lakhs
Add To Inquiry Basket
Fertilizers Manufacturing Handbook
Fertilizers Manufacturing Handbook

Starting a fertilizer manuf... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
High Demandable Business of Zinc Ingots Manufacturing Business of Zinc Ingots
High Demandable Business of Zinc Ingots Manufacturing Business of Zinc Ingots

Zinc ingots... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Paint Roller Manufacturing Business Industry of Paint Roller Manufacturing
Start Paint Roller Manufacturing Business Industry of Paint Roller Manufacturing

One of the finest ways to get a professional paint finish is with <... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How To Start Medium-Density Polyethylene (MDPE) Pipes Manufacturing Business Medium-Density Polyethylene (MDPE) Pipes Business
How To Start Medium-Density Polyethylene (MDPE) Pipes Manufacturing Business Medium-Density Polyethylene (MDPE) Pipes Business

 

How do Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan For Curcumin Extraction Unit
A Business Plan For Curcumin Extraction Unit

 

Curcumin Extracti... Read More

Capacity :
15,000 Kgs Per Annum , 7,140 Kgs Per Annum , , 2,76,300 Kgs Per Annum
Plant and Machinery cost:
216.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
511.00Lakhs
Add To Inquiry Basket
Start Business of Trading of Spices (Coriander, Chilli, Turmeric & Cumin)
Start Business of Trading of Spices (Coriander, Chilli, Turmeric & Cumin)

 

Indian culture has a very long history with sp... Read More

Capacity :
300 MT Per Annum , 300 MT Per Annum , 300 MT Per Annum , 300 MT Per Annum
Plant and Machinery cost:
6.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
44.00Lakhs
Add To Inquiry Basket
Emerging Business Investment Opportunities in Active Pharma Ingredients (API) Industry
Emerging Business Investment Opportunities in Active Pharma Ingredients (API) Industry

Production of Azithromycin, Cefixi... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Ciprofloxacin Hydrochloride (CIPRO) - Active Pharma Ingredient
Production of Ciprofloxacin Hydrochloride (CIPRO) - Active Pharma Ingredient

Production of Ciprofloxacin Hydrochloride (CIPRO) - Active ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Sterile Disposable Plastic Syringes Manufacturing
Sterile Disposable Plastic Syringes Manufacturing

Disposable Syringes are made from plastic material and are utilized in th... Read More

Capacity :
Disposable Plastic Syringes 3 ml Size: 1,440 Boxes / Day (Each Box = 100 Pcs) Disposable Plastic Syr
Plant and Machinery cost:
340.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
772.00Lakhs
Add To Inquiry Basket
Start a Disposable Plastic Syringes Manufacturing Business
Start a Disposable Plastic Syringes Manufacturing Business

Disposable Syringes are made from plastic material and are utilized in the sector of medical and veterinary science. because of their availability ... Read More

Capacity :
Disposable Plastic Syringes 1 ml Size: 720 Boxes / Day (Each Boxes = 100 Pcs) Disposable Plastic Sy
Plant and Machinery cost:
513.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
1300.00Lakhs
Add To Inquiry Basket
Manufacturing of Gold and Diamond Jewellery
Manufacturing of Gold and Diamond Jewellery

 

Manufacturing of Gold and Diamond Jewellery. Opportunities for Entrepreneurs to Start Own Business o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Startup Opportunities in Active Pharma Ingredients
Startup Opportunities in Active Pharma Ingredients

 

Startup Opportunities in Active Pharma Ing... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol

Active pharmaceutical ingredients are the active substances that are used in the manufacture of a drug and have ... Read More

Capacity :
Paracetamol:1,000 Kgs / day Azithromycin:500 Kgs / day Amoxicillin Trihydrate:500 Kgs / day
Plant and Machinery cost:
175.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1322.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mo... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack: 16,800 Nos per Annum
Plant and Machinery cost:
504.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
1381.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium ion batteries are those that can be recharged. Lithium batteries are now powering a wide range of electrical a... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack : 56 Nos./Day
Plant and Machinery cost:
503.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
1382.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Plastic Cutlery
Biodegradable Disposable Plastic Cutlery

Biodegradable Disposable Plastic Cutlery. (Eco Friendly Compostable Spoons Cutlery) Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen (CO2,gas at O0/1 matm. 1.429 g./l, crit. pressure, 49.7 matm.) is a colorless, odourless, an... Read More

Capacity :
Oxygen Gas: 667,800 Cu.mtrs per annum Nitrogen Gas: 2,480,400 Cu.mtrs per annum
Plant and Machinery cost:
306.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
643.00Lakhs
Add To Inquiry Basket
E-Waste Recycling for Extraction of Precious Metals (Nickel, Tin & Zinc), Gold, Silver, Palladium, Plastic, Glass and Copper
E-Waste Recycling for Extraction of Precious Metals (Nickel, Tin & Zinc), Gold, Silver, Palladium, Plastic, Glass and Copper

E-WASTE is a collective name for discarded electronic devices that enter the waste stream from various sources. It inc... Read More

Capacity :
Plastic Granules : 400000 Kgs./Annum Glass Scrap : 300000 Kgs./Annum Copper Scrap : 250000 Kgs./
Plant and Machinery cost:
85.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
829.00Lakhs
Add To Inquiry Basket
Hybrid Electric Scooter Assembling
Hybrid Electric Scooter Assembling

A plug-in hybrid electric vehicle (PHEV) is an HEV that can be plugged-in or recharged from wall electricity. PHEVs ar... Read More

Capacity :
50 Nos./day
Plant and Machinery cost:
95.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
279.00Lakhs
Add To Inquiry Basket
Commercial Vehicles Dealership -	Sale of Commercial Vehicles -	Spares -	Servicing
Commercial Vehicles Dealership - Sale of Commercial Vehicles - Spares - Servicing

Commercial vehicles are always under heavy duty operating conditions and therefore require mor... Read More

Capacity :
Heavy Commerical Vehicles (HCVs) : 480 Nos./Annum Commerical Vehicles (CVs) : 1440 Nos./Annum
Plant and Machinery cost:
350.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
1956.00Lakhs
Add To Inquiry Basket
Hybrid Electric Scooter Assembling Business
Hybrid Electric Scooter Assembling Business

Hybrid Electric Scooter Assembling Business. Electric Vehicles (EVs) Industry. Busine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mo... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack : 56 Nos/day
Plant and Machinery cost:
90.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
1076.00Lakhs
Add To Inquiry Basket
E-Rickshaw
E-Rickshaw

Electric Rickshaw, in short, also called as E-Rickshaw. This kind of transport vehicle are famous in many countries, t... Read More

Capacity :
1,200 Nos per Annum
Plant and Machinery cost:
29.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
324.00Lakhs
Add To Inquiry Basket
E-Rickshaw (Electric tuk-tuks) Manufacturing Business
E-Rickshaw (Electric tuk-tuks) Manufacturing Business

E-Rickshaw (Electric tuk-tuks) Manufacturing Business. How to Start Electric Vehicle ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Battery for Auto Vehicles
Battery for Auto Vehicles

An automotive... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to t... Read More

Capacity :
460 Boxes/Day
Plant and Machinery cost:
115.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
289.00Lakhs
Add To Inquiry Basket
Diamond & Gem Cutting / Polishing
Diamond & Gem Cutting / Polishing

Diamo... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Electroplating of Gold & Their Chemical Treatment in Golden Colour on Silver Thread
Electroplating of Gold & Their Chemical Treatment in Golden Colour on Silver Thread

 

Electroplating is the process of coating one metal... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Low Carbon Silicomanganese Production
Low Carbon Silicomanganese Production

Low Carbon Silicomanganese Production. Manufacturing Project of Low Carbon Silico Manganese. Production of Ferroalloys.

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to their availability in steriliz... Read More

Capacity :
Disposable Plastic Syringes 2 ml Size : 350 Boxes/day Disposable Plastic Syringes 5 ml Size : 350 Bo
Plant and Machinery cost:
151.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
343.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes made of plastic ... Read More

Capacity :
Disposable Plastic Syringes (2 ml Size):40000 Pcs/Day•Disposable Plastic Syringes (5 ml Size):40000
Plant and Machinery cost:
490.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
15.24%
Break Even Point (BEP):
61.07 %
TCI :
757.00 Lakhs
Cost of Project :
757.00Lakhs
Add To Inquiry Basket
SOLAR PANEL
SOLAR PANEL

Solar Panels are in general Silicon ... Read More

Capacity :
Solar PV Module (240 watt) : 350 Nos/day (25 MW)
Plant and Machinery cost:
278.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
852.00 Lakhs
Cost of Project :
852.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse

Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice stra... Read More

Capacity :
Disposable Paper Cups :7.5 MT/Day Disposable Paper Plates:7.5 MT/Day
Plant and Machinery cost:
32.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.18%
Break Even Point (BEP):
56.37 %
TCI :
314.00 Lakhs
Cost of Project :
314.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water
As the name implies, the mineral water is the purified water fortified with requisite amounts of minerals. It is either obtained from natural resource... Read More
Capacity :
3000000 Ltrs. /Annum
Plant and Machinery cost:
24.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
62.00 %
TCI :
112.00 Lakhs
Cost of Project :
112.00Lakhs
Add To Inquiry Basket
PAPER NAPKINS, FACIAL TISSUE, TOILET ROLLS, KITCHEN ROLL & HANDKERCHIEF
PAPER NAPKINS, FACIAL TISSUE, TOILET ROLLS, KITCHEN ROLL & HANDKERCHIEF

Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and new... Read More

Capacity :
Plant and Machinery cost:
88.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
39.00 %
TCI :
595.00 Lakhs
Cost of Project :
595.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water With PET Bottles
Packaged Drinking Water With PET Bottles
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a mo... Read More
Capacity :
40000 Ltrs./Day
Plant and Machinery cost:
59.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
63.00 %
TCI :
171.00 Lakhs
Cost of Project :
171.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
3000000 Bottles/Annum
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
52.00 %
TCI :
108.00 Lakhs
Cost of Project :
108.00Lakhs
Add To Inquiry Basket
DISPOSABLE SYRINGES
DISPOSABLE SYRINGES

Disposable needle is widely used by ... Read More

Capacity :
Disposable Plastic Syringes 2 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 5 ml Size :
Plant and Machinery cost:
636.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
42.00 %
TCI :
837.00 Lakhs
Cost of Project :
837.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER
PACKAGED DRINKING WATER

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
0
Plant and Machinery cost:
25.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
54.00 %
TCI :
100.00 Lakhs
Cost of Project :
100.00Lakhs
Add To Inquiry Basket
MANGANESE OXIDE (FERRITE GRADE)
MANGANESE OXIDE (FERRITE GRADE)

Manganese (Mn), is a chemical element, one of the silvery-white, hard, brittle metals of Group VII b of the periodic table. It was recognized as an... Read More

Capacity :
1200 MT/Annum
Plant and Machinery cost:
123.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
54.00 %
TCI :
316.00 Lakhs
Cost of Project :
316.00Lakhs
Add To Inquiry Basket
Rickshaw Cycle Tyre & Tubes
Rickshaw Cycle Tyre & Tubes

Rickshaw/Cycle Tyre & Tubes

Bicycle and rickshaw tyres & tubes are the bac... Read More

Capacity :
Rickshaw & Cycle Tyres : 1,500.00 Nos./Day,Rickshaw & Cycle Tubes: 1,500.00 Nos./Day
Plant and Machinery cost:
128.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
72.00 %
TCI :
570.00 Lakhs
Cost of Project :
570.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water & Pet Bottle
Packaged Drinking Water & Pet Bottle

-

Read More
Capacity :
7000 Ltrs Packaged Drinking/day, 7000 Nos. Pet Bottles/day
Plant and Machinery cost:
60.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
48.00 %
TCI :
135.00 Lakhs
Cost of Project :
135.00Lakhs
Add To Inquiry Basket
Alumina from Bauxite (By Calcination Process)
Alumina from Bauxite (By Calcination Process)

-

Read More
Capacity :
66.66 MT/Day
Plant and Machinery cost:
671.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
38.00 %
TCI :
2112.00 Lakhs
Cost of Project :
2112.00Lakhs
Add To Inquiry Basket
REDUCTION OF MANGANESE DIOXIDE TO MANGANESE OXIDE  (BY ROTARY KILN)
REDUCTION OF MANGANESE DIOXIDE TO MANGANESE OXIDE (BY ROTARY KILN)

REDUCTION OF MANGANESE DIOXIDE TO MANGANESE OXIDE 42% (BY ROTARY KILN)

Manganese d... Read More

Capacity :
6000 MT/Annum
Plant and Machinery cost:
127.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
42.00 %
TCI :
678.00 Lakhs
Cost of Project :
678.00Lakhs
Add To Inquiry Basket
WOODEN FURNITURE
WOODEN FURNITURE

Wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings and includes items such as chairs, tables... Read More

Capacity :
7500 Pcs./Annum
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
38.00 %
TCI :
118.00 Lakhs
Cost of Project :
118.00Lakhs
Add To Inquiry Basket
PAPER NAPKINS, TOILET ROLL & FACIAL PAPER FROM TISSUE PAPER ROLLS
PAPER NAPKINS, TOILET ROLL & FACIAL PAPER FROM TISSUE PAPER ROLLS

Hygiene is an essential component of healthy living, integral to achieving health and preventing disease. Not just selecting the right food choices... Read More

Capacity :
3000 MT/Annum, 6 MT Paper Napkins, 2 MT Toilet Rolls, 2 MT Facial Paper
Plant and Machinery cost:
41.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
49.00%
Break Even Point (BEP):
25.00 %
TCI :
923.00 Lakhs
Cost of Project :
923.00Lakhs
Add To Inquiry Basket
Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection
Pharmaceutical Tablets, Capsules, Liquid Oral, Ointment, Powder and Injection

The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backi... Read More

Capacity :
0
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
54.00 %
TCI :
125.00 Lakhs
Cost of Project :
125.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Automated Vehicle Scrappi... 1000 Vehicles per Month 29.00 2090.00
Start an Assembling unit ... 0 0.00 0.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
12345678910...

Showing 361 - 420 of 629 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR